The Engineering Inspection and Occupational Safety Department performs the work of fogging the departments at the headquarters of the General Company for Electrical and Electronic Industries

Font size: Decrease font Enlarge font

image

 

 

 

 

 

 

 

 

 

Today, Monday, March 15, 2021, the Engineering Inspection and Occupational Safety Department carried out fogging work at the headquarters of the General Company for Electrical and Electronic Industries in Waziriya And for departmental buildings / legal affairs / planning / engineering inspection and occupational safety / calculator / informatics / as part of health prevention measures to combat the effects of the spread of the corona virus  Other campaigns will follow for the rest of the factories, laboratories and departments of the headquarters, as well as the sites of Al-Ezz factories in Al-Taji, the lamp factory and the furniture factory, as part of the ongoing sterilization and fumigation campaigns. Protect all affiliates from this virus.