The General Company for Electrical and Electronic Industries is preparing the second batch of the sealing torrent for the benefit of the Oil Pipelines Company
In implementation of the directives of the General Manager of the company, Eng. Sufian Fawzi Shaalan Al-Jubouri, the cadres working in the feeder factory continued to supply the Oil Pipelines Company in the Dora region with the second batch of the torrent stamp (barcode) with a number of (600,000) pieces of white color out of the contract concluded with them, amounting to five million pieces
The product was examined in the quality control department before delivery to ensure the accuracy of the specification and its conformity with the conditions and standards of the Ministry of Oil